A problem about date
来源:互联网 发布:ibn软件 编辑:程序博客网 时间:2024/04/25 04:18
#include<iostream>#include<cstdio>using namespace std;int main(){ int c,y,m,d,w; while(scanf("%d%d%d",&y,&m,&d)!=EOF){ //用个cin,cout还超时。。。。 if(m==1){ m=13; y--; } if(m==2){ m=14; y--; } c=y/100; y=y%100; w=c/4-2*c+y+y/4+(13*(m+1)/5)+d-1; if(w<0) printf("%d\n",(w%7+7)%7); else printf("%d\n",w%7); } return 0;}
总结:蔡勒公式(一个专门用来计算周几的公式)直接百度百科蔡勒公式就行了。
开始本来想直接暴力打表的,后来想着有点麻烦,就没试。这道题出现在DP分类里,有点想不通,难道是还有其他的方法
0 0
- A problem about date
- 南工219 A Problem About Date
- An problem about date
- An problem about date
- An problem about date
- NYOJ219An problem about date
- oj32 An problem about date
- NYOJ--An problem about date
- NYOJ - An problem about date
- nyoj-An problem about date
- 【An problem about date 219】
- 219 An problem about date
- NYOJ An problem about date
- NYOJ219-An problem about date
- A problem about printf
- A problem about Autoinvoice
- A Problem about Polyline
- NYOJ 219 An problem about date
- [乐意黎原创] cuteftp 9 显示中文乱码
- ssh中“Host key verification failed.“的解决方案
- 人工智能、机器学习、计算机视觉
- Remove Duplicates from Sorted List
- Mysql创建及删除用户命令
- A problem about date
- 人工智能:未来千年能走多远
- 深度学习:推进人工智能的梦想
- 总线 && 缩写(abbreviation )
- Linux中socket 错误编码表 errno
- ORA-12154:TNS:无法解析指定的连接标识条款
- iOS7 状态栏换色
- 一种实现人工智能程序自进化的概念原理
- LeetCode二分查找总结