MySQL EVENT

来源:互联网 发布:mac 安装多个xcode 编辑:程序博客网 时间:2024/05/17 07:48

MySQL EVENT 

来源:http://samyu.blog.51cto.com/344284/146011
event_scheduler:
The MySQL event scheduler is a thread that runs in the background looking for events to execute. It spends a lot of time sleeping -- and won't do anything unless the new global variable "event_scheduler" is set to ON (1). So if you want to take advantage of this feature, do the following:

SET GLOBAL event_scheduler = 1;

To turn the feature off, do:

SET GLOBAL event_scheduler = 0;

As with all "SET GLOBAL" statements, you need the SUPER privilege to change the setting of the event_scheduler variable.

It is also possible to start the server with:

mysqld ... --event_scheduler=1

You can see what the current state of affairs is with

SHOW VARIABLES LIKE 'event_scheduler';
or
SELECT @@event_scheduler;

Now let's look at the syntax for events.

一、前言

自MySQL5.1.6起,增加了一个非常有特色的功能–事件调度器(Event Scheduler),可以用做定时执行某些特定任务(例如:删除记录、对数据进行汇总等等),来取代原先只能由操作系统的计划任务来执行的工作。更值得 一提的是MySQL的事件调度器可以精确到每秒钟执行一个任务,而操作系统的计划任务(如:Linux下的CRON或Windows下的任务计划)只能精 确到每分钟执行一次。对于一些对数据实时性要求比较高的应用(例如:股票、赔率、比分等)就非常适合。
事件调度器有时也可称为临时触发器(temporal triggers),因为事件调度器是基于特定时间周期触发来执行某些任务,而触发器(Triggers)是基于某个表所产生的事件触发的,区别也就在这里。
在使用这个功能之前必须确保event_scheduler已开启,可执行
SET GLOBAL event_scheduler = 1;
---或我们可以在配置my.ini文件 中加上 event_scheduler = 1
SET GLOBAL event_scheduler = ON;
来开启,也可以直接在启动命令加上“–event_scheduler=1”,例如:
mysqld ... --event_scheduler=1
要查看当前是否已开启事件调度器,可执行如下SQL:
SHOW VARIABLES LIKE 'event_scheduler';
SELECT @@event_scheduler;
SHOW PROCESSLIST;

二、创建事件(CREATE EVENT)

先来看一下它的语法:
CREATE EVENT [IF NOT EXISTS] event_name
ON SCHEDULE schedule
[ON COMPLETION [NOT] PRESERVE]
[ENABLE | DISABLE]
[COMMENT 'comment']
DO sql_statement;

schedule:
AT TIMESTAMP [+ INTERVAL INTERVAL]
| EVERY INTERVAL [STARTS TIMESTAMP] [ENDS TIMESTAMP]

INTERVAL:
quantity {YEAR | QUARTER | MONTH | DAY | HOUR | MINUTE |
WEEK | SECOND | YEAR_MONTH | DAY_HOUR | DAY_MINUTE |
DAY_SECOND | HOUR_MINUTE | HOUR_SECOND | MINUTE_SECOND}
1) 首先来看一个简单的例子来演示每秒插入一条记录到数据表
USE test;
CREATE TABLE aaa (timeline TIMESTAMP);
CREATE EVENT e_test_insert
ON SCHEDULE EVERY 1 SECOND
DO INSERT INTO test.aaa VALUES (CURRENT_TIMESTAMP);
等待3秒钟后,再执行查询看看:
mysql> SELECT * FROM aaa;
+---------------------+
| timeline |
+---------------------+
| 2007-07-18 20:44:26 |
| 2007-07-18 20:44:27 |
| 2007-07-18 20:44:28 |
+---------------------+
2) 5天后清空test表:
CREATE EVENT e_test
ON SCHEDULE AT CURRENT_TIMESTAMP + INTERVAL 5 DAY
DO TRUNCATE TABLE test.aaa;
3) 2007年7月20日12点整清空test表:
CREATE EVENT e_test
ON SCHEDULE AT TIMESTAMP '2007-07-20 12:00:00'
DO TRUNCATE TABLE test.aaa;
4) 每天定时清空test表:
CREATE EVENT e_test
ON SCHEDULE EVERY 1 DAY
DO TRUNCATE TABLE test.aaa;
5) 5天后开启每天定时清空test表:
CREATE EVENT e_test
ON SCHEDULE EVERY 1 DAY
STARTS CURRENT_TIMESTAMP + INTERVAL 5 DAY
DO TRUNCATE TABLE test.aaa;
6) 每天定时清空test表,5天后停止执行:
CREATE EVENT e_test
ON SCHEDULE EVERY 1 DAY
ENDS CURRENT_TIMESTAMP + INTERVAL 5 DAY
DO TRUNCATE TABLE test.aaa;
7) 5天后开启每天定时清空test表,一个月后停止执行:
CREATE EVENT e_test
ON SCHEDULE EVERY 1 DAY
STARTS CURRENT_TIMESTAMP + INTERVAL 5 DAY
ENDS CURRENT_TIMESTAMP + INTERVAL 1 MONTH
DO TRUNCATE TABLE test.aaa;
[ON COMPLETION [NOT] PRESERVE]可以设置这个事件是执行一次还是持久执行,默认为NOT PRESERVE。
8) 每天定时清空test表(只执行一次,任务完成后就终止该事件):
CREATE EVENT e_test
ON SCHEDULE EVERY 1 DAY
ON COMPLETION NOT PRESERVE
DO TRUNCATE TABLE test.aaa;
[ENABLE | DISABLE]可是设置该事件创建后状态是否开启或关闭,默认为ENABLE。
[COMMENT ‘comment’]可以给该事件加上注释。

三、修改事件(ALTER EVENT)

ALTER EVENT event_name
[ON SCHEDULE schedule]
[RENAME TO new_event_name]
[ON COMPLETION [NOT] PRESERVE]
[COMMENT 'comment']
[ENABLE | DISABLE]
[DO sql_statement]
1) 临时关闭事件
ALTER EVENT e_test DISABLE;
2) 开启事件
ALTER EVENT e_test ENABLE;
3) 将每天清空test表改为5天清空一次:
ALTER EVENT e_test
ON SCHEDULE EVERY 5 DAY;

四、删除事件(DROP EVENT)

语法很简单,如下所示:
DROP EVENT [IF EXISTS] event_name
例如删除前面创建的e_test事件
DROP EVENT e_test;
当然前提是这个事件存在,否则会产生ERROR 1513 (HY000): Unknown event错误,因此最好加上IF EXISTS
DROP EVENT IF EXISTS e_test;
注意:如果你将event执行了Alter event event_name disable.那么当你重新启动mysql服务
器后,该event将被删除(测试版本:5.1.30)

应用案例

本案例是利用 event scheduler 的特性,每秒钟调用一次存储过程,用于判断 SLAVE 是否正常运行,如果发现 SLAVE 关闭了,忽略 0 次错误,然后重新启动 SLAVE。
  • 首先创建存储过程
    delimiter //
    create procedure `Slave_Monitor`()
    begin
    SELECT VARIABLE_VALUE INTO @SLAVE_STATUS
    FROM information_schema.GLOBAL_STATUS
    WHERE VARIABLE_NAME='SLAVE_RUNNING';
    IF ('ON' != @SLAVE_STATUS) THEN
    SET GLOBAL SQL_SLAVE_SKIP_COUNTER=0;
    SLAVE START;
    END IF;
    end; //
    delimiter ;
    由于存储过程中无法调用类似 SHOW SLAVE STATUS 这样的语句,因此无法得到确切的复制错误信息和错误代码,不能进一步的处理 SLAVE 停止的各种情况。
  • 接着,创建任务
    CREATE EVENT IF NOT EXISTS `Slave_Monitor`
    ON SCHEDULE EVERY 5 SECOND
    ON COMPLETION PRESERVE
    DO
    CALL Slave_Monitor();
    创建了一个任务,每 5秒钟执行一次,任务结束后依旧保留该任务,而不是删除。当然了,在本例中的任务不会结束,除非将它手动禁止了。
  • 如果在运行中想要临时关闭一下某个任务,执行 ALTER EVENT 语句即可:
        (root:localhost:)test> alter event `Slave_Monitor` ON
    COMPLETION PRESERVE DISABLE;
    (root:localhost:)test> alter event `Slave_Monitor` ON
    COMPLETION PRESERVE ENABLE;

原创粉丝点击