my spc
来源:互联网 发布:网络协议栈 编辑:程序博客网 时间:2024/05/20 22:00
2007-07 ~
SAE
SPC
Online process monitoring
Real-time alert and auto mail sending by different levels
Analysis with filter and sort by specific information
Link to various data source & collect data by sample/frequency/batch
Variable chart type: IR, XR, XS, XRMR, XSMR
Attribute chart type: P, NP, C, U, Y (Yield)
OOC (Out of Control) cause and action marking
Variable CPK and attribute yield summary report
OCR Database Management System is the major production database in SAE MES, which includes:
Flexible for changing environment
Scalable & expendable architecture
Real-time data collection
Data validation
Data lost prevention
Failure logging
Web-based reporting system
Data Trace (Web)
Tester Monitor (Web)
Web-based real-time raw data query from wafer to HDD (forward & backward)
Monitor tester for the latest status & auto-alert for abnormal condition & failure
Real-time traffic light monitor of all testers in production line for yield, mean & sigma
I would prefer to work on new projects from initial creation to final delivery, and be responsible for the long term architecuture throughout the whole project life cycle.
I hate taking those projects with bad design and implementation that were transfered to my hand while still in progress.
Unfortunately I suffer from that case recently. There are some projects were designed in short-term patch in my company, their run on somewhere unknown corner, my company has more than 300 servers run in data center, and we have to pay several millions RMB license and maintenance cost to Microsoft, Oracle and other vendors.
The activities initiated by recent Global Financia Crisis in order to reduce IT cost & investment came out. I took several projects like that, for example DB server consolidation, server migration, consolidate all versions of a certain program into one version. They are all very tedious and time-consuming. My boss don't think so, he said that we have already implemented the functions, so it's should be eazy to upgrade, and he push me very hard. But finally, I persuaded him to accept my thought. You know, you must be very familiar with it before you can perform the modification.
Actually every company process or system has some issues, I would prefer to take some actions to work out the solutions and action plan to improve the process/system firstly, and then submit to management to decide, and don't want to talk around to bring everyone awareness that there are issues, people are not blind.
The greate challenge I encountered is resource issue e.g. man power, man-day. Projects are very intimidating in size of scope.
Technical and English ability is my strong point.
You can help me achieve personal growth goal, and hope I can became CTO within five years.
成功案例:
When I first came into this company, I encountered a problem and often was waken up to responsible for production down due to server or database services down issues. The central database is too old, and intimeliness to support production. And application serve use microsoft DCOM technology to collect production data, which is implemented in single thread and sychronized, that is, work stations have queue in line to invoke the interface to get things done which is provided by DCOM server. With the business volume growth, the data capacity increasing as well, and the server became slow to response. Although many colleagues already know the existence of this issue, but they don't want to take initiative to improve because too much of work to do and achivement is hard to be seen by management. Finally I reimplemented and upgrade the data collection system by using Microsoft COMPlus technology, multiple threads and synchronized in program, and implement memory database for those production critical data, finally achived 10 times of performance improvement.
And another case,
Users complained that report too time-consuming, sometimes need 20 minutes even 1 hour to pull out the report, the user level is quite high, a Vice Predident, and attractived the attention of our Vice President, he gave a command to our team that we must improved the function to get the result from around half hour to half minutes, we are all feel frustrated within the team. Then I got a good idea that run a program to get the result previously at ngith
- my spc
- SPC
- SPC
- SPC
- xfa spc
- Spc统计 - 关于spc的专业名词
- SPC基本概念及理解
- SPC全面质量管理教程
- Speecys SPC-101C
- SPC质量控制管理系统
- 5inch LCD SPC-S92048A
- My
- MY
- MY
- MY
- my
- my
- my
- 浅析HTTP协议
- [转]Discuz!X 插件开发实例教程-右下角弹出广告框(一)
- [转]Discuz!X 插件开发实例教程-右下角弹出广告框(二)
- 触发器在保证数据库完整性和一致性中的应用
- 祥解C++中的this指针
- my spc
- 实用Google Chrome,键盘快捷键大全
- Callback Functions Tutorial
- 二进制、八进制、十进制、十六进制之间转换
- 资源收藏
- ubuntu10安装oracel10g xe
- 学习着.NET 还要学习java
- 不要急,我与你一起学习JSP(二)——JSP的基本概述
- Android学习路线-mars