1. Make a procedure of SCM plan for software project.
- A project software manager designates a CM at the beginning of a software life cycle.
- SCM group get a identified for software work products which to be placed under configuration management in project planning time.
- CM makes a SCM plan protocol after project planning activity.
- SCM group review and approve the SCM plan in review time.
- CM goes along edition control of SCM plan in software life cycle.
- SCM group manage SCM activity of project according to SCM plan in software life cycle.
2. Make a model of SCM plan for software project.
- CM makes a SCM plan protocol model after project planning activity.
- SCM group review and approve the SCM plan model in review time.
- CM goes along edition control of SCM plan model in software life cycle.
- SCM group make a SCM plan of project according to SCM plan model in software life cycle.
3. Software Configuration Management process.
- SCM group designate principal of SCM plan at the beginning of a software life cycle.
- Analyst of SCM make SCM plan at the beginning of a software life cycle.
- SCM group review and approve the SCM plan in review time.
- Analyst of SCM assigns system space for SCM library after the beginning of a project.
- SCM group implement and record activity of SCM after the beginning of a project.
- SCM group audit SCM plan and release SCM reports on schedule.
- SCM group do some Measurement for SCM on schedule.
- SQA approve activity of SCM on schedule.
- PM approve activity of SCM on schedule.
4. A procedure of create software baseline.
- SCCB approve new software baseline after it pass the process of change controlled.
- SCCB do some Regression Testing after it bring into new software baseline.
- SCCB release a new software baseline after the Regression Testing.
5. A procedure of audit software baseline.
- SCCB add Progress time chart of baseline audit to SCM plan and project plan.
- SCCB release message about audit of software baseline to SCM group and SEG at the beginning of a project.
- SCCB check the audit of software baseline according to standard format at the beginning of a project.
- SCCB check the process of software baseline according to SCM process and standard at the beginning of a project.
- SCCB release audit reports according to evaluation result at the beginning of a project.
- SCCB give audit reports to PM at the beginning of a project.
- SCCB Track measure which is identified in audit in software life cycle.