Hartals UVA10050

来源:互联网 发布:淘宝充话费系统 编辑:程序博客网 时间:2024/05/16 01:47



  Problem D: Hartals 

A social research organization has determined a simple set of parameters to simulate the behavior of the political parties of our country. One of the parameters is a positive integer h (called the hartal parameter) that denotes the average number of days between two successive hartals (strikes) called by the corresponding party. Though the parameter is far too simple to be flawless, it can still be used to forecast the damages caused by hartals. The following example will give you a clear idea:


Consider three political parties. Assume h1 = 3, h2 = 4 and h3 = 8 where hi is the hartal parameter for party i ( i = 1, 2, 3). Now, we will simulate the behavior of these three parties for N = 14 days. One must always start the simulation on a Sunday and assume that there will be no hartals on weekly holidays (on Fridays and Saturdays).


 1234567891011121314Days               SuMoTuWeThFrSaSuMoTuWeThFrSaParty 1  x  x  x  x  Party 2   x   x   x  Party 3       x      Hartals  12   34  5  


The simulation above shows that there will be exactly 5 hartals (on days 3, 4, 8, 9 and 12) in 14 days. There will be no hartal on day 6 since it is a Friday. Hence we lose 5 working days in 2 weeks.

In this problem, given the hartal parameters for several political parties and the value of N, your job is to determine the number of working days we lose in those N days.

Input 

The first line of the input consists of a single integer T giving the number of test cases to follow.

The first line of each test case contains an integer N ( $7 \le N \le 3650$) giving the number of days over which the simulation must be run. The next line contains another integer P ( $1 \le P \le 100$) representing the number of political parties in this case. The i­th of the next P lines contains a positive integer hi (which will never be a multiple of 7) giving the hartal parameter for party i ( $1 \le i \leP$).

Output 

For each test case in the input output the number of working days we lose. Each output must be on a separate line.

Sample Input 

2143348100412152540

Sample Output 

515



Miguel Revilla 
2000-12-26

看懂题意就很简单了,感觉没用到什么数据结构。。直接用数组就可以过。

#include<iostream>#include<cstring>using namespace std;int arry[100];int day[3700];int main(){    int n;    cin>>n;    while(n--)    {        memset(arry,0,sizeof(arry));        memset(day,0,sizeof(day));        int m,i,h,j;        cin>>m>>h;        for(i=0;i<h;i++)            cin>>arry[i];        for(i=0;i<h;i++)        {            j=0;            while(j+arry[i]<=m)            {                day[j+arry[i]]=1;                j=arry[i]+j;            }        }        int s=0;        for(i=1;i<=m;i++)        {            if((i%7!=0)&&(i%7!=6))            {                if(day[i]==1)                {                    s++;                }            }        }        cout<<s<<endl;    }    return 0;}
原创粉丝点击