栈与队列之进阶
来源:互联网 发布:windows 桌面管理 编辑:程序博客网 时间:2024/06/05 00:48
Description
There is a famous railway station in PopPush City. Country there is incredibly hilly. The station was built in last century. Unfortunately, funds were extremely limited that time. It was possible to establish only a surface track. Moreover, it turned out that the station could be only a dead-end one (see picture) and due to lack of available space it could have only one track.
The local tradition is that every train arriving from the direction A continues in the direction B with coaches reorganized in some way. Assume that the train arriving from the direction A has N <= 1000 coaches numbered in increasing order 1, 2, ..., N. The chief for train reorganizations must know whether it is possible to marshal coaches continuing in the direction B so that their order will be a1, a2, ..., aN. Help him and write a program that decides whether it is possible to get the required order of coaches. You can assume that single coaches can be disconnected from the train before they enter the station and that they can move themselves until they are on the track in the direction B. You can also suppose that at any time there can be located as many coaches as necessary in the station. But once a coach has entered the station it cannot return to the track in the direction A and also once it has left the station in the direction B it cannot return back to the station.
The local tradition is that every train arriving from the direction A continues in the direction B with coaches reorganized in some way. Assume that the train arriving from the direction A has N <= 1000 coaches numbered in increasing order 1, 2, ..., N. The chief for train reorganizations must know whether it is possible to marshal coaches continuing in the direction B so that their order will be a1, a2, ..., aN. Help him and write a program that decides whether it is possible to get the required order of coaches. You can assume that single coaches can be disconnected from the train before they enter the station and that they can move themselves until they are on the track in the direction B. You can also suppose that at any time there can be located as many coaches as necessary in the station. But once a coach has entered the station it cannot return to the track in the direction A and also once it has left the station in the direction B it cannot return back to the station.
Input
The input consists of blocks of lines. Each block except the last describes one train and possibly more requirements for its reorganization. In the first line of the block there is the integer N described above. In each of the next lines of the block there is a permutation of 1, 2, ..., N. The last line of the block contains just 0.
The last block consists of just one line containing 0.
The last block consists of just one line containing 0.
Output
The output contains the lines corresponding to the lines with permutations in the input. A line of the output contains Yes if it is possible to marshal the coaches in the order required on the corresponding line of the input. Otherwise it contains No. In addition, there is one empty line after the lines corresponding to one block of the input. There is no line in the output corresponding to the last ``null'' block of the input.
Sample Input
51 2 3 4 55 4 1 2 3066 5 4 3 2 100
Sample Output
YesNoYes
#include<cstdio>#include<stack>using namespace std;int main(){int n,a[1500],i,j;while(scanf("%d",&n) && n){stack<int>st;while(scanf("%d",&a[0]) && a[0]){for( i = 1 ; i < n ; i++){scanf("%d",&a[i]);}for( i = 1 , j = 0 ; i <= n ; i++){st.push(i);while(st.top() == a[j]){j++;st.pop();if(st.empty()) break;}}if( j == n) printf("Yes\n");elseprintf("No\n");}printf("\n");}}
0 0
- 栈与队列之进阶
- 栈与队列之进阶
- BDS之栈与队列
- 数据结构之栈与队列
- CrackingtheCodeInterview之栈与队列
- 数据结构之栈与队列
- 数据结构之:栈与队列
- Csharp进阶:栈和队列
- 小白进阶之优先队列排序
- 进阶篇:延时队列之DelayQueue(十四)
- 进阶篇:优先级队列之PriorityBlockingQueue(十五)
- 数据结构与算法之----栈与队列
- 数据结构与算法之栈与队列
- 数据结构与算法之栈与队列
- 数据结构与算法之栈与队列
- 数据结构与算法之栈与队列
- 队列之顺序队列与循环队列
- 队列之顺序队列与循环队列
- tomcat 工作原理
- STM32F0在IAR新建工程
- 毕业后第一份工作 即 华为工作 心得体会
- activity和软键盘遮挡问题
- Python 遍历目录
- 栈与队列之进阶
- 整数串问题
- hdu4897(树链剖分)
- Java多线程之BlockingQueue深入分析
- Java:应用Observer接口实践Observer模式
- 2015CCPC南阳场 H - Sudoku
- LeetCode 338. Counting Bits
- CentOS tcpflow抓包
- A*B Problem II