GJB438B-2009附录G与DI-IPSC-81427的差异——GJB438B学习笔记之五

来源:互联网 发布:即影即有软件 编辑:程序博客网 时间:2024/05/22 08:13

GJB438B-2009附录GDI-IPSC-81427的差异

——GJB438B学习笔记之五

 

GJB438B-2009

附录G 4.2.1

如果在本文档方法所适用的活动中,对软件开发方法有更好的描述,则可直接引用。

DI-IPSC-81427

4.2.1

Reference may be made to other paragraphs in this plan if the methods are better described in context with the activities to which they will be applied.

备注

按后者:“如果在本计划的关于方法所适用的活动的其他章条中,对软件开发方法有较好的描述,则可直接引用。”

 

GJB438B-2009

附录G 4.2.2

 

DI-IPSC-81427

4.2.2

Standards for code shall be provided for each programming language to be used. They shall include at a minimum:

a. Standards for format (such as indentation, spacing, capitalization, and order of information)

b. Standards for header comments (requiring, for example, name/identifier of the code; version identification; modification history; purpose; requirements and design decisions implemented; notes on the processing (such as algorithms used, assumptions, constraints, limitations, and side effects); and notes on the data (inputs, outputs, variables, data structures, etc.)

c. Standards for other comments (such as required number and content expectations)

d. Naming conventions for variables, parameters, packages, procedures, files, etc.

e. Restrictions, if any, on the use of programming language constructs or features

f. Restrictions, if any, on the complexity of code aggregates

备注

GJB438B附录G 4.2.2没有关于编码标准的要求。

 

GJB438B-2009

附录G 4

4.2.3.1 采用可重用软件产品

4.2.3.2 开发可重用软件产品

4.2.6 决策理由的纪录

DI-IPSC-81427

4

4.2.3.1 Incorporating reusable software products

4.2.3.2 Developing reusable software products.

4.2.6 Recording rationale.

备注

前者3个标题的行文风格有异。

 

GJB438B-2009

附录G 5.1

计划的跟踪和修订

DI-IPSC-81427

5.1

Following and updating plans

备注

按后者是“计划的遵循和修订”。

 

GJB438B-2009

附录G 5.1

策划(包括重新策划)工作宜基于估计,包括:规模、工作量、关键计算机资源等估计。本条也包括进度的导出方法等。

DI-IPSC-81427

5.1

including the intervals for management review

备注

两者互不相同。

 

GJB438B-2009

附录G 5.3

用户要求分析

DI-IPSC-81427

5.3

Analysis of user input

备注

前者比后者的范围大。

 

GJB438B-2009

附录G 5.14

软件验收支持

DI-IPSC-81427

 

 

备注

后者无此条。

 

GJB438B-2009

附录G 5.18

 

DI-IPSC-81427

5.17

5.17.1 Problem/change reports, including items to be recorded (candidate items include project name, originator, problem number, problem name, software element or document affected, origination date, category and priority, description, analyst assigned to the problem, date assigned, date completed, analysis time, recommended solution, impacts, problem status, approval of solution, follow-up actions, corrector, correction date, version where corrected, correction time, description of solution implemented)

备注

前者没有对问题/更改报告的具体描述。

 

 

DI-IPSC-81427 SOFTWARE DEVELOPMENT PLAN (SDP)已被DI-IPSC-81427A取代。

原创粉丝点击