【动态规划】Batch Scheduling
来源:互联网 发布:淘宝老客户维护软件 编辑:程序博客网 时间:2024/06/06 18:19
DescriptionThere is a sequence of N jobs to be processed on one machine. The jobs are numbered from 1 to N,so that the sequence is 1,2,..., N. The sequence of jobs must be partitioned into one or morebatches, where each batch consists of consecutive jobs in the sequence. The processing starts attime 0. The batches are handled one by one starting from the first batch as follows. If a batch bcontains jobs with smaller numbers than batch c, then batch b is handled before batch c. The jobsin a batch are processed successively on the machine. Immediately after all the jobs in a batchare processed, the machine outputs the results of all the jobs in that batch. The output time ofa job j is the time when the batch containing j finishes.A setup time S is needed to set up the machine for each batch. For each job i, we know its costfactor Fi and the time Ti required to process it. If a batch contains the jobs x, x+1,... , x+k,and starts at time t, then the output time of every job in that batch is t + S + (Tx + Tx+1 + ...+ Tx+k). Note that the machine outputs the results of all jobs in a batch at the same time. If theoutput time of job i is Oi, its cost is Oi * Fi. For example, assume that there are 5 jobs, thesetup time S = 1, (T1, T2, T3, T4, T5) = (1, 3, 4, 2, 1), and (F1, F2, F3, F4, F5) = (3, 2, 3, 3,4). If the jobs are partitioned into three batches {1, 2}, {3}, {4, 5}, then the output times (O1,O2, O3, O4, O5) = (5, 5, 10, 14, 14) and the costs of the jobs are (15, 10, 30, 42, 56), respectively.The total cost for a partitioning is the sum of the costs of all jobs. The total cost for the examplepartitioning above is 153.You are to write a program which, given the batch setup time and a sequence of jobs with theirprocessing times and cost factors, computes the minimum possible total cost.InputYour program reads from standard input. The first line contains the number of jobs N, 1 <= N <=10000. The second line contains the batch setup time S which is an integer, 0 <= S <= 50. Thefollowing N lines contain information about the jobs 1, 2,..., N in that order as follows. Firston each of these lines is an integer Ti, 1 <= Ti <= 100, the processing time of the job. Followingthat, there is an integer Fi, 1 <= Fi <= 100, the cost factor of the job.OutputYour program writes to standard output. The output contains one line, which contains one integer:the minimum possible total cost.Sample Input511 33 24 32 31 4Sample Output153
不难想出一个比较简单的方程:
f[i] = min{f[j] + (out[j] + S + sumT[i] - sumT[j]) * (sumF[i] - sumF[j])}。
但是这个方程中有两个变量(out[j] - sumT[j]和sumF[j]),所以无法使用斜率+单调队列优化。
所以改正推为倒推(将前面所说的前缀和改为后缀和)。
新的转移方程:f[i] = max{f[j] + (S + sumT[i] - sumT[j]) * sumF[i]}。
这下使用斜率优化就变得很简单了。
很容易得到斜率不等式:
f[f] - f[k]
—————————— >= sumF[i]
sumT[j] - sumT[k]
那么斜率优化就顺理成章了。
Accode:
#include <cstdio>#include <cstdlib>#include <string>#include <algorithm>const int maxN = 10010;typedef long long int64;int64 F[maxN], sT[maxN], sF[maxN], S;int q[maxN], n, f = 0, r = 1;inline int getint(){ int res = 0; char tmp; while (!isdigit(tmp = getchar())); do res = (res << 3) + (res << 1) + tmp - '0'; while (isdigit(tmp = getchar())); return res;}#define check(j, k, i) \(F[j] - F[k] <= sF[i] * (sT[j] - sT[k]))#define cmp(j, k, i) \((F[j] - F[k]) * (sT[k] - sT[i]) \<= (F[k] - F[i]) * (sT[j] - sT[k]))int main(){ freopen("batch_scheduling.in", "r", stdin); freopen("batch_scheduling.out", "w", stdout); n = getint(); S = getint(); for (int i = 1; i < n + 1; ++i) { sT[i] = getint(); sF[i] = getint(); } sT[n + 1] = sF[n + 1] = 0; q[0] = n + 1; for (int i = n; i; --i) { sT[i] += sT[i + 1]; sF[i] += sF[i + 1]; while (f < r - 1 && !check(q[f], q[f + 1], i)) ++f; F[i] = F[q[f]] + (S + sT[i] - sT[q[f]]) * sF[i]; while (f < r - 1 && !cmp(q[r - 2], q[r - 1], i)) --r; q[r++] = i; } printf("%I64d\n", F[1]); return 0;}
- 【动态规划】Batch Scheduling
- Batch Scheduling
- PKU1180 Batch Scheduling
- poj 1180 Batch Scheduling
- poj 1180 Batch Scheduling
- poj1180 Batch Scheduling
- 批处理(Batch Scheduling)
- poj 1180 Batch Scheduling
- POJ 1180 Batch Scheduling
- poj1180 Batch Scheduling
- 【暑假】[深入动态规划]UVa 1380 A Scheduling Problem
- dp专辑 B - Batch Scheduling [ 斜率优化]
- Poj1180 Batch Scheduling --- DP的斜率优化
- poj 1180 Batch Scheduling 斜率优化dp
- poj 1180 Batch Scheduling ( 斜率优化DP )
- poj 1180 Batch Scheduling 斜率优化dp
- POJ 1180 Batch Scheduling (斜率优化DP)
- POJ - 1180 Batch Scheduling(斜率优化DP)
- 爱情这东西,幸福的是转身后也许一不小心就是一辈子,但更多的是满地悲伤...我不会放弃,即使她心冷了
- Android开发之AppWidget应用(一)
- 算法竞赛入门经典 2.1 for 循环
- SGU 119 Magic Pairs
- 算法竞赛入门经典 2.2 循环结构程序设计
- 【动态规划】Batch Scheduling
- Qt网络编程之QNetworkReply
- 再学C++ Primer(6)-语句
- 【Coding】Enterprise Architect 7.0入门教程
- dbExpress数据库控制
- River Hopscotch解题报告
- 再学Java基础(2)标识符,变量,数据类型。以及 if与for语句
- linux 源码浏览工具
- 设计模式C#描述之——简单工厂模式 .