poj 1180 Batch Scheduling(DP-单调性优化)
来源:互联网 发布:巫师三优化 编辑:程序博客网 时间:2024/05/22 14:29
Batch Scheduling
Time Limit: 1000MS Memory Limit: 10000KTotal Submissions: 3145 Accepted: 1442
Description
There is a sequence of N jobs to be processed on one machine. The jobs are numbered from 1 to N, so that the sequence is 1,2,..., N. The sequence of jobs must be partitioned into one or more batches, where each batch consists of consecutive jobs in the sequence. The processing starts at time 0. The batches are handled one by one starting from the first batch as follows. If a batch b contains jobs with smaller numbers than batch c, then batch b is handled before batch c. The jobs in a batch are processed successively on the machine. Immediately after all the jobs in a batch are processed, the machine outputs the results of all the jobs in that batch. The output time of a job j is the time when the batch containing j finishes.
A setup time S is needed to set up the machine for each batch. For each job i, we know its cost factor Fi and the time Ti required to process it. If a batch contains the jobs x, x+1,... , x+k, and starts at time t, then the output time of every job in that batch is t + S + (Tx + Tx+1 + ... + Tx+k). Note that the machine outputs the results of all jobs in a batch at the same time. If the output time of job i is Oi, its cost is Oi * Fi. For example, assume that there are 5 jobs, the setup time S = 1, (T1, T2, T3, T4, T5) = (1, 3, 4, 2, 1), and (F1, F2, F3, F4, F5) = (3, 2, 3, 3, 4). If the jobs are partitioned into three batches {1, 2}, {3}, {4, 5}, then the output times (O1, O2, O3, O4, O5) = (5, 5, 10, 14, 14) and the costs of the jobs are (15, 10, 30, 42, 56), respectively. The total cost for a partitioning is the sum of the costs of all jobs. The total cost for the example partitioning above is 153.
You are to write a program which, given the batch setup time and a sequence of jobs with their processing times and cost factors, computes the minimum possible total cost.
A setup time S is needed to set up the machine for each batch. For each job i, we know its cost factor Fi and the time Ti required to process it. If a batch contains the jobs x, x+1,... , x+k, and starts at time t, then the output time of every job in that batch is t + S + (Tx + Tx+1 + ... + Tx+k). Note that the machine outputs the results of all jobs in a batch at the same time. If the output time of job i is Oi, its cost is Oi * Fi. For example, assume that there are 5 jobs, the setup time S = 1, (T1, T2, T3, T4, T5) = (1, 3, 4, 2, 1), and (F1, F2, F3, F4, F5) = (3, 2, 3, 3, 4). If the jobs are partitioned into three batches {1, 2}, {3}, {4, 5}, then the output times (O1, O2, O3, O4, O5) = (5, 5, 10, 14, 14) and the costs of the jobs are (15, 10, 30, 42, 56), respectively. The total cost for a partitioning is the sum of the costs of all jobs. The total cost for the example partitioning above is 153.
You are to write a program which, given the batch setup time and a sequence of jobs with their processing times and cost factors, computes the minimum possible total cost.
Input
Your program reads from standard input. The first line contains the number of jobs N, 1 <= N <= 10000. The second line contains the batch setup time S which is an integer, 0 <= S <= 50. The following N lines contain information about the jobs 1, 2,..., N in that order as follows. First on each of these lines is an integer Ti, 1 <= Ti <= 100, the processing time of the job. Following that, there is an integer Fi, 1 <= Fi <= 100, the cost factor of the job.
Output
Your program writes to standard output. The output contains one line, which contains one integer: the minimum possible total cost.
Sample Input
511 33 24 32 31 4
Sample Output
153
题意:N个任务(按顺序编号1——N),1台机器。告诉你完成每个任务需要的时间Ti和完成每个任务的花费有关因素Fi。要你把这些任务分n(任意)批完成(同一批必须是相邻的),同一批任务完成的时间点相同。开始每一批任务之前需要启动机器,时间为S。每个任务的花费是完成的时间点t*Fi。
例如:
ID 1 2 3 4
T = {1 , 2 , 3 , 4};
F = {5 , 6 , 7 , 8};
S = 1;
把任务分成{1,2}、{3}、{4};
第一批完成花费:(S+T1+T2)*(F1+F2) = (1+1+2)*(5+6) = 44;
第二批完成花费:(S+T1+T2+S+T3)*F3 = (1+1+2+1+3)*7 = 56;
第三批完成花费:(S+T1+T2+S+T3+S+T4)*F4 = (1+1+2+1+3+1+4)*8 = 104;
总花费:44+56+104 = 204.
求最少花费。
思路:
#include <iostream>#include <cstdio>using namespace std;const int maxn = 10010;int sumT[maxn] , sumF[maxn] , que[maxn] , dp[maxn] , head , tail , N , S;void initial(){ for(int i = 0; i < maxn; i++){ sumT[i] = 0; sumF[i] = 0; que[i] = 0; dp[i] = 0; } head = 0; tail = 0;}void readcase(){ scanf("%d" , &S); for(int i = 0; i < N; i++){ scanf("%d%d" , &sumT[i] , &sumF[i]); } for(int i = N-1; i >= 0; i--){ sumT[i] += sumT[i+1]; sumF[i] += sumF[i+1]; }}void computing(){ que[tail] = N; for(int i = N-1; i >= 0; i--){ while(tail>head){ int j = que[head+1] , k = que[head]; if(dp[k]-sumT[k]*sumF[i]>=dp[j]-sumT[j]*sumF[i]) head++; else break; } dp[i] = dp[que[head]]+(S+sumT[i]-sumT[que[head]])*sumF[i]; while(tail>head){ int j = que[tail] , k = que[tail-1]; if((dp[i]-dp[j])*(sumT[j]-sumT[k])<=(dp[j]-dp[k])*(sumT[i]-sumT[j])) tail--; else break; } que[++tail] = i; } printf("%d\n" , dp[0]);}int main(){ while(scanf("%d" , &N) != EOF){ initial(); readcase(); computing(); } return 0;}
0 0
- poj 1180 Batch Scheduling(DP-单调性优化)
- poj 1180 Batch Scheduling 斜率优化dp
- poj 1180 Batch Scheduling ( 斜率优化DP )
- poj 1180 Batch Scheduling 斜率优化dp
- POJ 1180 Batch Scheduling (斜率优化DP)
- POJ - 1180 Batch Scheduling(斜率优化DP)
- poj 1180 Batch Scheduling dp斜率优化
- poj 1180 Batch Scheduling(斜率优化dp或决策单调)
- POJ-1180 Batch Scheduling 【逆向DP+斜率优化】
- poj 1180 Batch Scheduling
- poj 1180 Batch Scheduling
- poj 1180 Batch Scheduling
- POJ 1180 Batch Scheduling
- hdu Lawrence(DP-单调性优化-斜率优化)
- dp专辑 B - Batch Scheduling [ 斜率优化]
- Poj1180 Batch Scheduling --- DP的斜率优化
- hdu 5064 Find Sequence(单调性优化DP)
- [NOI2009]诗人小G(决策单调性优化dp)
- 手机170号段银行不识别 运营商称正努力解决
- [源代码]解析 SynchronousQueue 上界,下界.. 数据保存和数据传递. 阻塞队列. 有无频繁await?
- LeetCode: Count and Say
- C primer plus 第二章
- Java 接口应用案例 (策略设计模式使用)
- poj 1180 Batch Scheduling(DP-单调性优化)
- uboot 环境变量实现简析
- Desugar Scala(15) -- unapply和unapplySeq方法
- 创建本地yum源的三种方法
- uboot移植与源码分析总结(3)-Serial驱动分析
- Mongoose源码分析:外篇之web服务器
- 关于如何打开谷歌的电脑设置方法
- Mongoose源码分析:Intoduction and Installation
- [C] sizeof居然不是函数是运算符