Redundant Paths-POJ3177(并查集+双连通分量)
来源:互联网 发布:数据nbastat 编辑:程序博客网 时间:2024/05/21 07:09
Redundant Paths
Description
In order to get from one of the F (1 <= F <= 5,000) grazing fields (which are numbered 1..F) to another field, Bessie and the rest of the herd are forced to cross near the Tree of Rotten Apples. The cows are now tired of often being forced to take a particular path and want to build some new paths so that they will always have a choice of at least two separate routes between any pair of fields. They currently have at least one route between each pair of fields and want to have at least two. Of course, they can only travel on Official Paths when they move from one field to another.
Given a description of the current set of R (F-1 <= R <= 10,000) paths that each connect exactly two different fields, determine the minimum number of new paths (each of which connects exactly two fields) that must be built so that there are at least two separate routes between any pair of fields. Routes are considered separate if they use none of the same paths, even if they visit the same intermediate field along the way.
There might already be more than one paths between the same pair of fields, and you may also build a new path that connects the same fields as some other path.
Given a description of the current set of R (F-1 <= R <= 10,000) paths that each connect exactly two different fields, determine the minimum number of new paths (each of which connects exactly two fields) that must be built so that there are at least two separate routes between any pair of fields. Routes are considered separate if they use none of the same paths, even if they visit the same intermediate field along the way.
There might already be more than one paths between the same pair of fields, and you may also build a new path that connects the same fields as some other path.
Input
Line 1: Two space-separated integers: F and R
Lines 2..R+1: Each line contains two space-separated integers which are the fields at the endpoints of some path.
Lines 2..R+1: Each line contains two space-separated integers which are the fields at the endpoints of some path.
Output
Line 1: A single integer that is the number of new paths that must be built.
Sample Input
7 71 22 33 42 54 55 65 7
Sample Output
2
Hint
Explanation of the sample:
One visualization of the paths is:
1 – 2: 1 –> 2 and 1 –> 6 –> 5 –> 2
1 – 4: 1 –> 2 –> 3 –> 4 and 1 –> 6 –> 5 –> 4
3 – 7: 3 –> 4 –> 7 and 3 –> 2 –> 5 –> 7
Every pair of fields is, in fact, connected by two routes.
It's possible that adding some other path will also solve the problem (like one from 6 to 7). Adding two paths, however, is the minimum.
One visualization of the paths is:
1 2 3 +---+---+ | | | | 6 +---+---+ 4 / 5 / / 7 +Building new paths from 1 to 6 and from 4 to 7 satisfies the conditions.
1 2 3 +---+---+ : | | : | | 6 +---+---+ 4 / 5 : / : / : 7 + - - - -Check some of the routes:
1 – 2: 1 –> 2 and 1 –> 6 –> 5 –> 2
1 – 4: 1 –> 2 –> 3 –> 4 and 1 –> 6 –> 5 –> 4
3 – 7: 3 –> 4 –> 7 and 3 –> 2 –> 5 –> 7
Every pair of fields is, in fact, connected by two routes.
It's possible that adding some other path will also solve the problem (like one from 6 to 7). Adding two paths, however, is the minimum.
Source
USACO 2006 January Gold
题意:
给定一个无向连通图,判断至少加多少的边,才能使任意两点之间至少有两条的独立的路(没有公共的边,但可以经过同一个中间的顶点)。
给定一个无向连通图,判断至少加多少的边,才能使任意两点之间至少有两条的独立的路(没有公共的边,但可以经过同一个中间的顶点)。
思路:
在同一个双连通分量里的所有的点可以看做一个点,收缩后,新图是一棵树,树的边边是原图的桥。现在问题转化为“在树中至少添加多少条边能使图变成边双连通图”,即添加的边的个数=(树中度为一的节点数目+1)/2;
#include <cstdio>#include <cstring>#include <cstdlib>#include <cmath>#include <algorithm>#define LL long long using namespace std;const int MaxN = 10100;const int MaxM = 5100;// 建图typedef struct node{int v;int next;}Line;Line Li[MaxN*2]; int Belong[MaxM];//判断所属的双连通的集合//回到最优先遍历度最小的节点和记录点DFS的顺序int low[MaxM],dfn[MaxM];int Head[MaxM],top;int pre[MaxM]; //并查集int vis[MaxM],Num;//标记点的状态int Bridge[MaxM][2],NumB;//记录图中的桥void AddEdge(int u,int v)// 建边{Li[top].v=v; Li[top].next=Head[u];Head[u]=top++;Li[top].v=u; Li[top].next=Head[v];Head[v]=top++;}int Find(int x)// 路径压缩{return pre[x]==-1?x:pre[x]=Find(pre[x]);}void Union(int x,int y){int Fx = Find(x);int Fy = Find(y);if(Fx!=Fy){pre[Fx] = Fy;}}void dfs(int u,int father){low[u]=dfn[u]=Num++;vis[u]=1;//表示已经遍历但是没有遍历完子女for(int i=Head[u];i!=-1;i=Li[i].next){int j=Li[i].v;if(vis[j]==1&&j!=father)// 回到的祖先{low[u]=min(low[u],dfn[j]);}if(vis[j]==0){dfs(j,u);low[u]=min(low[j],low[u]);if(low[j]<=dfn[u])//说明是双连分量中的边{Union(u,j);}if(low[j]>dfn[u])//桥{Bridge[NumB][0]=j;Bridge[NumB++][1]=u;}}}vis[u]=2;}int main(){int n,m;while(~scanf("%d %d",&n,&m)){top=0;int u,v;memset(Head,-1,sizeof(Head));memset(pre,-1,sizeof(pre));for(int i=1;i<=m;i++){scanf("%d %d",&u,&v);AddEdge(u,v);}memset(vis,0,sizeof(vis));memset(Belong ,-1 ,sizeof(Belong));Num = 0 ; NumB=0 ;dfs(1,0);Num = 0;for(int i=1;i<=n;i++){int k=Find(i);//给双连通分量集合编号if(Belong[k]==-1){Belong[k]=++Num;}Belong[i]=Belong[k];}memset(vis,0,sizeof(vis));for(int k=0;k<NumB;k++){int i=Bridge[k][0];int j=Bridge[k][1];vis[Belong[i]]++;vis[Belong[j]]++;}int ans = 0;for(int i=1;i<=n;i++){if(vis[i]==1){ans++;}}printf("%d\n",(ans+1)/2);}return 0;}
1 0
- Redundant Paths-POJ3177(并查集+双连通分量)
- 【poj3177】【双连通分量】Redundant Paths
- poj3177 Redundant Paths 边双连通分量
- poj3177 Redundant Paths 双连通分量
- poj3177 Redundant Paths 双连通分量
- poj3177——Redundant Paths(双连通分量)
- poj3177——Redundant Paths(双连通分量)
- POJ3177 Redundant Paths 3352的双胞胎题 双连通分量
- poj3177 Redundant Paths 无向图 双连通分量 桥
- poj3177 Redundant Paths(边双连通分量+缩点)
- [POJ3177]Redundant Paths 边双连通分量 做题笔记
- [POJ3177]Redundant Paths Tarjan求双连通分量
- 【POJ3177】Redundant Paths-边双连通分量+缩点
- [双连通分量 缩点 并查集] POJ 3177 Redundant Paths & 3352 Road Construction
- poj3177 边双连通分量+缩点(并查集实现)
- POJ 3177 Redundant Paths(边双连通分量)
- POJ-3177 Redundant Paths (边双连通分量[Tarjan])
- ★【双连通分量】Redundant Paths
- Spring MVC之@RequestBody, @ResponseBody @PathVariable @SessionAttributes @ModelAttribute详解
- 【Unity】Unity 3D坐标系介绍
- Android AIDL实践
- 程序无法运行:Error Default activity not found
- php生成xml
- Redundant Paths-POJ3177(并查集+双连通分量)
- iOS开发UI篇—CAlayer(创建图层)
- php导入SQL文件
- Javascript_备忘录2
- intelligj idea 开发web项目使用dwr
- sql之left join、right join、inner join的区别
- 新版spring官网下载jar包
- erlang 杂记
- php 导出excel 很简单很好用