POJ3177 Redundant Paths —— 边双联通分量 + 缩点
来源:互联网 发布:查看淘宝产品价格变化 编辑:程序博客网 时间:2024/06/05 02:42
题目链接:http://poj.org/problem?id=3177
Redundant Paths
Time Limit: 1000MS Memory Limit: 65536KTotal Submissions: 15852 Accepted: 6649
Description
In order to get from one of the F (1 <= F <= 5,000) grazing fields (which are numbered 1..F) to another field, Bessie and the rest of the herd are forced to cross near the Tree of Rotten Apples. The cows are now tired of often being forced to take a particular path and want to build some new paths so that they will always have a choice of at least two separate routes between any pair of fields. They currently have at least one route between each pair of fields and want to have at least two. Of course, they can only travel on Official Paths when they move from one field to another.
Given a description of the current set of R (F-1 <= R <= 10,000) paths that each connect exactly two different fields, determine the minimum number of new paths (each of which connects exactly two fields) that must be built so that there are at least two separate routes between any pair of fields. Routes are considered separate if they use none of the same paths, even if they visit the same intermediate field along the way.
There might already be more than one paths between the same pair of fields, and you may also build a new path that connects the same fields as some other path.
Given a description of the current set of R (F-1 <= R <= 10,000) paths that each connect exactly two different fields, determine the minimum number of new paths (each of which connects exactly two fields) that must be built so that there are at least two separate routes between any pair of fields. Routes are considered separate if they use none of the same paths, even if they visit the same intermediate field along the way.
There might already be more than one paths between the same pair of fields, and you may also build a new path that connects the same fields as some other path.
Input
Line 1: Two space-separated integers: F and R
Lines 2..R+1: Each line contains two space-separated integers which are the fields at the endpoints of some path.
Lines 2..R+1: Each line contains two space-separated integers which are the fields at the endpoints of some path.
Output
Line 1: A single integer that is the number of new paths that must be built.
Sample Input
7 71 22 33 42 54 55 65 7
Sample Output
2
Hint
Explanation of the sample:
One visualization of the paths is:
1 – 2: 1 –> 2 and 1 –> 6 –> 5 –> 2
1 – 4: 1 –> 2 –> 3 –> 4 and 1 –> 6 –> 5 –> 4
3 – 7: 3 –> 4 –> 7 and 3 –> 2 –> 5 –> 7
Every pair of fields is, in fact, connected by two routes.
It's possible that adding some other path will also solve the problem (like one from 6 to 7). Adding two paths, however, is the minimum.
One visualization of the paths is:
1 2 3 +---+---+ | | | | 6 +---+---+ 4 / 5 / / 7 +Building new paths from 1 to 6 and from 4 to 7 satisfies the conditions.
1 2 3 +---+---+ : | | : | | 6 +---+---+ 4 / 5 : / : / : 7 + - - - -Check some of the routes:
1 – 2: 1 –> 2 and 1 –> 6 –> 5 –> 2
1 – 4: 1 –> 2 –> 3 –> 4 and 1 –> 6 –> 5 –> 4
3 – 7: 3 –> 4 –> 7 and 3 –> 2 –> 5 –> 7
Every pair of fields is, in fact, connected by two routes.
It's possible that adding some other path will also solve the problem (like one from 6 to 7). Adding two paths, however, is the minimum.
Source
USACO 2006 January Gold
题解:
边双联通分量的模板题。
代码如下:
#include <iostream>#include <cstdio>#include <algorithm>#include <cstring>using namespace std;typedef long long LL;const int INF = 2e9;const LL LNF = 9e18;const int MOD = 1e9+7;const int MAXN = 5e3+10;struct Edge{ int to, next; bool cut;}edge[MAXN<<2];int head[MAXN], tot;int dfn[MAXN], low[MAXN], belong[MAXN], Stack[MAXN], instack[MAXN];int index, block, top;int du[MAXN];void add(int u, int v){ edge[tot].to = v; edge[tot].cut = false; edge[tot].next = head[u]; head[u] = tot++;}void Tarjan(int u, int pre){ low[u] = dfn[u] = ++index; Stack[top++] = u; instack[u] = true; for(int i = head[u]; i!=-1; i = edge[i].next) { int v = edge[i].to; if(v==pre) continue; if(!dfn[v]) { Tarjan(v, u); low[u] = min(low[u], low[v]); if(low[v]>dfn[u]) { edge[i].cut = true; edge[i^1].cut = true; } } else if(instack[v]) low[u] = min(low[u], dfn[v]); } if(low[u]==dfn[u]) { block++; int v; do { v = Stack[--top]; instack[v] = false; belong[v] = block; }while(v!=u); }}void init(int n){ tot = 0; memset(head,-1,sizeof(head)); memset(dfn,0,sizeof(dfn)); memset(low,0,sizeof(low)); memset(instack,0,sizeof(instack)); memset(du,0,sizeof(du)); index = block = top = 0;}void solve(int n){ Tarjan(1, 0); for(int u = 1; u<=n; u++) for(int i = head[u]; i!=-1; i = edge[i].next) if(edge[i].cut) du[belong[u]]++; int leaf = 0; for(int i = 1; i<=block; i++) if(du[i]==1) leaf++; printf("%d\n", (leaf+1)/2);}int main(){ int n, m; while(scanf("%d%d",&n,&m)!=EOF) { init(n); for(int i = 1; i<=m; i++) { int u, v; scanf("%d%d",&u,&v); add(u, v); add(v,u); } solve(n); }}
阅读全文
0 0
- poj3177—Redundant Paths(缩点+边双联通分量)
- POJ3177 Redundant Paths —— 边双联通分量 + 缩点
- POJ3177 Redundant Paths (双联通缩点)
- POJ3177 Redundant Paths【边双联通分量】【Tarjan】
- 边连通分量/缩点-POJ3177-Redundant Paths
- poj 3177 Redundant Paths (边双联通分量+缩点)
- POJ 3177 Redundant Paths 边双联通分量 缩点
- poj3177 Redundant Paths(边双联通)
- poj3177 Redundant Paths(边双连通分量+缩点)
- 【POJ3177】Redundant Paths-边双连通分量+缩点
- poj3177 Redundant Paths 简单双联通求桥
- poj3177——Redundant Paths//最小割边
- poj3177——Redundant Paths(双连通分量)
- poj3177——Redundant Paths(双连通分量)
- Redundant Paths+POJ+边双联通分量(有重边-奇偶判断法)
- POJ3177.Redundant Paths——增加多少条边使原图变为边双连通图
- poj3177 Redundant Paths 边双连通分量
- poj3177 - Redundant Paths
- 对Python、shell的一些思考
- HashMap实现原理及源码分析
- java开发环境配置
- 解析json
- B
- POJ3177 Redundant Paths —— 边双联通分量 + 缩点
- Docker学习总结——从零开始搭建Jenkins+Docker自动化集成环境
- Scrapy安装错误:Microsoft Visual C++ 14.0 is required
- test
- IIIT5K数据提取预处理
- POJ 2533 最长上升子序列
- 浏览器默认样式清除
- APP启动页背景颜色变化
- Python中字符串常用的方法